  OUR COMPANY PROJECTS
Update 2021 Model SH7: 500,1000,2000 KG/HR Special compressed air system, MSW, Medical and industrial waste
Update 2021 Model SH 7-500, 1000, 2000 kgs/hour with Treatment system , auto garbage conveyor with optional fuel. Stop use fuel can also incinerate.
 
 
 
Capacity : 500,1000 kg/hr.

Primary chamber is the incinerator for convert air into combustible gas at a temperature of about 300–800 Degree Celsius. The air is distributed under the air compression and compressed into the incinerator by the primary air fan through inner incinerator walls with air jacket system. The air compressor head is installed and surrounded inside the incinerator for the purpose of primary air preheating in order to distribute air thoroughly in the primary chamber. Compressed air can be adapted to match with types of waste. The inner surface of the upper incinerator is a smooth steel sheet so there is no accumulation of slag. The floor surface of the incinerator is constructed of refractory bricks and concrete with heat resistance material not less than 1200 Degree Celsius which help extending the lifespan of the incinerator longer than general incinerators. Regarding to the ash conveyor, ashes can be removed easily because the floor surface of the incinerator is a smooth steel sheet. Its surroundings are built up with refractory bricks. The structure of the external incinerator is steel sheet assembled in a square shape, coated with heat resistant painting which help reducing incinerator’s wall temperature not more than 60 Degree Celsius. 
Waste Combustion Assistance Equipment 

Air compression system in primary chamber has 80 air compression heads in 6 columns with 25 air dispensing holes installed within primary chamber working together with fuel dispensing control system of fire nozzle in order to match with the quantity of wastes in each period during combustion. Accordingly, it results to the highest efficiency for saving fuels in the combustion. If waste humidity is less than 30% then it is not required fuel for combustion.

The secondary chamber is the smoke chamber. It is to burn gases arising from the carbonization process of the waste combustion chamber. Gases or smokes are burned in this secondary chamber at a temperature of not less than 800–1200 Degree Celsius and it takes no less than 3 seconds for the combustion. The external structure is steel sheet assembled in a tube shape. Its internal structure is built up with refractory brick with heat resistance of not less than 1300 Degree Celsius. The external steel surface is coated with heat resistant painting of not less than 200 °C. 
 

Performance is guaranteed for equipment or parts and quality of defects or damages arising out of the normal use. The incinerator warranty is valid for 1 year with 6-monthly inspection. 

For more information, pls contact SANKYO country manager in each based.

OUR COMPANY PROJECTS
- Update 2021 Model SH7: 500,1000,2000 KG/HR Special compressed air system, MSW, Medical and industrial waste
- Update 2021 Model SH6: 500,1000,2000 KG/HR Special water system, MSW, Medical and industrial waste(This model can produce electricity)
- Update 2021 Model SH5: 200, 300, 500,1000 KG/HR Special water system, MSW, Medical and industrial waste
- Update 2021 Model SH4: 100 KG/HR Special water system, MSW, Medical and industrial waste
- Model SH3: 50 and 70 KG/HR Special compressed air system
- Model SH2: 50 KG/HR Special compressed air system
- Model SH1: 15 and 30 KG/HR Special compressed air system
- Hospital/Medical/Infectious waste incinerator 100-325 Kg/ Hr (2 sets)
- BaThanh Tra Chinh Phu- SANKYO waste incinerators
- BaThanh Tra Chinh Phu- SANKYO waste incinerators
View all

Copyright by sankyo-asia.com
Engine by MAKEWEBEASY